{"The Princethorpe Foundation": {"id": 1,"link": "https://www.theprincethorpefoundation.co.uk/","color": "#222222","newsSrc": "/news/?pid=11&nid=5","storiesSrc": "/news/?pid=11&nid=7"}}
Artboard 1
Skip to content ↓

The Princethorpe Foundation Continues To Invest In The Crescent School Site

25 Jun

Over the summer break, there will be further exciting improvements to the Crescent School site.

In the holidays, the IT suite will be gutted and a new ceiling, lighting and flooring installed.  The room will be redesigned and have new furniture.  A new teaching space will be created that includes an interactive teaching wall.

At the far end of the school, the Reception and Year 1 classrooms will also be completely refurbished with new ceiling, new lights, new carpets and a fresh coat of paint.  It will provide an exciting and stimulating environment for our youngest learners.

A three-phase development of the main corridor, affectionately known as the 'green mile', will commence starting with the top section (from the Library down to the first set of Fire Doors).  Again a new ceiling will be installed, with new lights, new flooring, built in display units and the walls repainted.

The work is all part of the Princethorpe Foundation’s long term estates development plan which includes significant investment in the Crescent School facilities.

Comments Joe Thackway, Headmaster, “It will be all systems go all summer, so pupils, staff and parents can expect great things on their return in September.”

Tagged  2018-2019